The conveying machines in a plant – screw conveyors, chain conveyors, bucket elevators, belt conveyors – wear out. The question is not whether a repair will be needed, but when: at a convenient, planned time or at the most inconvenient one, during operation. Here is an example calculation of what the two approaches look like over one year.
1. What planned maintenance includes
- Regular inspection: noise, vibration, bearing temperature, motor current, material leaks.
- Lubricating the bearings and checking the oil in the gearboxes.
- Checking the wear of the screw flight, chain, buckets and belt.
- Replacing worn parts during a planned shutdown, before they fail.

Screw conveyor drive

Belt conveyor rollers
2. What an emergency repair costs
In a breakdown you pay for more than the repair. You also pay for the lost production, the people waiting, urgent delivery of parts, overtime and often damage to other parts – for example a broken screw flight that has also damaged the casing. The biggest share is usually the downtime.
3. Example calculation
Assumptions (illustrative only): a line with 6 conveying machines; one hour of downtime costs the plant €400 in lost output and labour; with the emergency approach there are 4 breakdowns a year, each with 10 hours of downtime; with planned maintenance there is 1 breakdown a year with 4 hours of downtime, and parts are replaced during planned shutdowns, when the line is stopped anyway.
| Emergency repairs only | Planned maintenance | |
|---|---|---|
| Downtime | 4 × 10 h = 40 h | 1 × 4 h = 4 h |
| Cost of downtime (€400/h) | €16,000 | €1,600 |
| Parts and repairs | €8,000 (urgent delivery of parts and damage the breakdown causes to other parts of the machine) | €6,000 |
| Inspections and maintenance labour | – | €3,000 |
| Total per year | €24,000 | €10,600 |
The figures are illustrative. For your production line, use your own cost per hour of downtime and your own number of breakdowns – the difference usually stays in favour of planned maintenance, because downtime is the largest cost.
4. What to check and when
| When | What to check |
|---|---|
| Every day, during the round | noise, vibration, material leaks, heating of bearings and geared motors |
| Every week | belt or chain tension, lubrication according to the instructions, condition of the seals |
| During a planned shutdown | thickness of the screw flight and casing, wear of the chain and paddles, buckets and their bolts, pulleys and rollers |
5. Where to start
- Carry out a general inspection of the conveying machines together with the manufacturer or service provider and see which parts are close to replacement.
- Plan the replacement of these parts for the annual overhaul or another planned shutdown of the production line.
- For the machines the whole line depends on, order the parts that are made to size in good time.