How to choose a belt conveyor: belt, width and incline

Home » Technical articles » How to choose a belt conveyor: belt, width and incline

A belt conveyor looks like a simple machine: a frame, two drums, rollers and a belt. But whether it runs for years or stops every week depends on a few decisions made at the design stage. In this article we go through them in the order we make them ourselves: which belt, how wide, at what speed, at what incline and with what drive. At the end we list the mistakes we see most often on conveyors we are called in to repair.

1. Which belt to choose

The choice starts with the material, not the conveyor. The belt is the part that wears fastest and costs the most to replace, so it has to suit what it will carry.

Belt typeSuitable forNot suitable for
PVC or PU, smoothpackaged goods, light bulk materials, food productsheavy, sharp and abrasive materials, high temperature
Rubber textile (EP), smoothsand, crushed stone, concrete mixes, fertilisers, coal, wood chipssteep inclines – material slides back
Rubber textile with chevron profilethe same materials at inclines up to about 30°sticky materials that fill the profile
Cleated belt (with sidewalls)granulates, chips, grain at steep inclinesmaterials that need frequent cleaning off the belt

Rubber textile belts are designated by strength and number of plies, for example EP 400/3 – polyester-polyamide fabric, total strength 400 N/mm, three plies. The longer the conveyor and the heavier the material, the greater the belt tension and the more plies are needed. The number of plies also sets the minimum drum diameter. If the drum is smaller than the belt allows, the plies delaminate and the splice fails long before the belt is worn.

When the material is hot, oily or chemically aggressive, the rubber must be specified for it. In your enquiry, it is important to state not only what the material is, but also its temperature and moisture.

2. How wide the belt should be and how fast it should run

Width and speed are chosen together, because both determine capacity. At the same width, a faster belt carries more, but it also creates more dust, wears faster and handles material less well at transfer points. So where possible we prefer a wider, slower belt.

Volumetric capacity is calculated as follows:

Q = 3600 · A · v · k

where Q is the capacity in m³/h, A is the cross-section of material on the belt in m², v is the belt speed in m/s and k is an incline factor (k = 1 for a horizontal conveyor; at about 18° it drops to about 0.85).

For a flat belt the cross-section is approximately A ≈ b² · tan(β) / 4. Here b is the usable width, about 0.9 · B − 0.05 m, where B is the belt width, and β is the surcharge angle of the material on the moving belt – usually between 10° and 20°.

Example. Belt B = 600 mm, horizontal, speed 1.5 m/s, material with β = 20°. The usable width is 0.9 · 0.6 − 0.05 = 0.49 m. The cross-section is 0.49² · tan 20° / 4 ≈ 0.022 m². The capacity is 3600 · 0.022 · 1.5 ≈ 118 m³/h. At a bulk density of 1.5 t/m³ that is about 175 t/h. If the belt is troughed – three rollers at 20° – the cross-section is about twice as large, and at the same width the capacity almost doubles.

Width also depends on the largest lumps. To stop lumps falling off the side and hitting the rollers, the width should be at least 3–5 times the largest lump. Our conveyors are built with belts from 100 to 1100 mm.

MaterialTypical belt speed
grain, granulates, pellets1.0 – 2.0 m/s
sand, crushed stone1.5 – 2.5 m/s
powders (cement, flour)0.5 – 1.0 m/s
wood chips, biomass1.0 – 2.0 m/s
packaged goods, sacks0.3 – 1.0 m/s

3. How steep the incline can be

This is where most mistakes are made. On a smooth belt every material has an angle above which it starts to slide back. It depends on particle shape, moisture and whether the material is fed evenly. Guide values for a smooth belt:

MaterialMaximum incline on a smooth belt
grain (wheat, maize)12 – 15°
pellets, round granules10 – 12°
dry sand15°
wet sand20°
crushed stone18°
cement20°
wood chipsup to 25°

When the incline has to be steeper, we use a chevron belt (up to about 30°) or a cleated belt with sidewalls, which carries material up much steeper inclines. An example from our work: for a process line for dried granulate we built an inclined conveyor with a 500 mm cleated rubber belt, so that the material does not slide back on the incline.

Sometimes the better solution is a longer conveyor with a gentler incline, or a different machine. If the material has to go up almost vertically, a bucket elevator is the better choice.

4. How much power is needed

Power has three parts: lifting the material, overcoming roller friction and moving the empty belt. For a rough estimate:

P ≈ (Qt · H + Qt · L · f · C) / 367 + P0

where P is the power in kW, Qt is the capacity in t/h, H is the lift height in m, L is the length in m, f is the friction factor (about 0.02–0.03), C is a factor for short conveyors (2–3 for lengths under 20 m) and P0 is the power for the empty belt. Gearbox efficiency and a margin are added to the result.

Example. A 12 m conveyor, 4 m lift, capacity 50 t/h. Lifting needs 50 · 4 / 367 ≈ 0.55 kW, friction about 0.1–0.15 kW and the empty belt about 0.3–0.5 kW. In total about 1 kW at the shaft. With gearbox efficiency and a margin for starting under load, that comes to a 1.5–2.2 kW motor. In one of our quotations for a conveyor of this length, with a 600 mm chevron belt fed from an intake funnel, we specified a motor of up to 4 kW – with a margin for starting under load.

The geared motor must also have a suitable service factor (fs). It shows how much the gearbox’s rated torque exceeds the torque required. For light, single-shift duty an fs of about 1.0–1.2 is enough, but for 24/7 operation with shock loads at the feed point we look for 1.4 or more. A gearbox running at its limit heats up and wears much faster.

5. Details that decide whether the conveyor runs without problems

  • The loading point. Material should fall in the direction of travel, in the middle of the belt and from the lowest possible height. Impact rollers go under the loading point, and sealed skirt boards at the sides, so nothing spills.
  • The belt scraper. With sticky and wet materials, without a scraper on the drive drum, the carry-back falls on the return rollers, builds up and makes the belt run off track.
  • Tensioning. The tension station must have enough travel, because a new belt stretches during the first weeks.
  • Covers. Outdoors and in dusty halls, covers protect the material from rain and wind and reduce dust. On long routes a walkway is worth having.
  • Safety devices. On longer and more important conveyors we fit a speed sensor, belt misalignment sensors and pull-cord emergency stops.

6. Common mistakes

  • A smooth belt on too steep an incline. The conveyor passes the trial with a little material, but at full capacity the material starts to slide. Fixing it later – a new cleated belt and changes to the rollers – costs more than planning it from the start.
  • Drums that are too small. They look like a saving, but they shorten the life of the belt and the splice.
  • A narrow belt for coarse material. Lumps fall off the side, hit the return rollers and cut the belt.
  • A drive with no margin. When starting with a loaded belt, the motor trips or the gearbox overheats.
  • An unspecified material. “Bulk material” is not enough. Bulk density, moisture, lump size and temperature change the belt, the incline and the power.

What to send us

To propose the right conveyor we need: the material (bulk density, moisture, lump size, temperature), the capacity in t/h or m³/h, the length and height of the route, where the material comes from and where it has to go, and a photo of the site. From this data we choose the belt, width, speed, incline and drive, and the quotation gives you the price and lead time.

See also the belt conveyors we manufacture and the project for a belt conveyor with intake hopper for a precast concrete plant.

Looking for a similar solution?

See the belt conveyors we manufacture, or contact us for a quotation to your specification.